Skip to content
  • About
  • Services
  • Projects
  • Careers
  • Contact
  • About
  • Services
  • Projects
  • Careers
  • Contact

Wastewater Treatment Facility Solar Plant

This project involved construction of a 1-megawatt solar power plant at the Roger Road Sewer Treatment Plant. Work included the grading and compacting of six acres of land, the forming and pouring of the concrete ballast tracker foundations and the erection of the single-access tracker system, the installation of all solar modules, the DC and AC power systems and the construction of the high-voltage interconnect to the local utility.

Project Type: Ground-up
Location: Tucson, Arizona
  • About
  • Services
  • Projects
  • Careers
  • Contact
  • Subcontractors
  • About
  • Services
  • Projects
  • Careers
  • Contact
  • Subcontractors

2127 E. Speedway, Suite 101, Tucson, Arizona 85719 | 520.323.3831 | KB-01 ROC 196321

Copyright © 2025 Barker Contracting Inc. | Website by: Heart and Soul Web Design
  • BARKER CONTRACTING
  • 2127 E Speedway Blvd #101
  • Tucson, AZ 85719
  • (520) 323-3831
  • Info@barker.staging-1.site
  • KB-01 ROC 196321

COMPANY

  • About US
  • Contact
  • Careers
  • Prequalifications
  • About US
  • Contact
  • Careers
  • Prequalifications

WHAT WE DO

  • PreConstruction
  • Construction Management
  • Construction
  • PreConstruction
  • Construction Management
  • Construction

PROJECT TYPES

  • Industrial / Manufacturing
  • Commercial / Office
  • Life Science / Healthcare
  • Community
  • Retail
  • Entertainment
  • Solar
  • Industrial / Manufacturing
  • Commercial / Office
  • Life Science / Healthcare
  • Community
  • Retail
  • Entertainment
  • Solar
Copyright © 2025 Barker Contracting Inc. | Website by: Heart and Soul Web Design
Scroll to Top